Minutes of the Forward Endcap EMC SADC Crate Design Vibe/eZuce meeting, 29th of June 2020, 14:00-15:25

Presence:

  • Bochum: Matthias, Fritz-Herbert, Malte, Tobias H., Tobias T., Sebastian, Thorsten, Thien-Vu
  • Basel: -
  • Bonn: Johannes
  • Groningen: -
  • Uppsala: Pawel
  • Giessen: -

Submodule Testing

  • Thien-Vu needs access to the Bonn gitlab for the SADC firmware. Christoph will be contacted.

Submodule Manufacturing:

  • Exchange of submodules done
  • Christoph delivered signal cables to Bochum
  • Bochum will investigate & prepare to order FlexPCBs for annealing LEDs (~1000 missing)

Endcap setup Jülich

  • Manufacturing of manipulator tools to hold submodules finished

Update to the EMC TDR

  • Please start writing, in case of questions ask Fritz-Herbert, for technical things ask Tobias T.

Preamplifier

  • We are still missing about 600 APD preamplifiers. Fritz-Herbert will contact Basel.

Readout Hardware

  • Pawel is working on crate controller design and will pick up ADC firmware tests; Data Concentrator prototype boards are in production.

-- FritzHerbertHeinsius - 29 Jun 2020

-- MalteAlbrecht - 29 Jun 2020
Topic revision: r2 - 29 Jun 2020, MalteAlbrecht
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)