Minutes of the Forward Endcap EMC SADC Crate Design Vibe/eZuce meeting, 29th of June 2020, 14:00-15:25

Presence:

  • Bochum: Matthias, Fritz-Herbert, Malte, Tobias H., Tobias T., Sebastian, Thorsten, Thien-Vu
  • Basel: -
  • Bonn: Johannes
  • Groningen: -
  • Uppsala: Pawel
  • Giessen: -

Submodule Testing

  • Thien-Vu needs access to the Bonn gitlab for the SADC firmware. Christoph will be contacted.

Submodule Manufacturing:

  • Exchange of submodules done
  • Christoph delivered signal cables to Bochum
  • Bochum will investigate & prepare to order FlexPCBs for annealing LEDs (~1000 missing)

Endcap setup Jülich

  • Manufacturing of manipulator tools to hold submodules finished

Update to the EMC TDR

  • Please start writing, in case of questions ask Fritz-Herbert, for technical things ask Tobias T.

Preamplifier

  • We are still missing about 600 APD preamplifiers. Fritz-Herbert will contact Basel.

Readout Hardware

  • Pawel is working on crate controller design and will pick up ADC firmware tests; Data Concentrator prototype boards are in production.

-- FritzHerbertHeinsius - 29 Jun 2020

-- MalteAlbrecht - 29 Jun 2020
Topic revision: r2 - 2020-06-29, MalteAlbrecht
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Panda Wiki Send feedback | Imprint | Privacy Policy (in German)