Minutes of the forward endcap EMC Vibe/eZuce meeting, 23rd of September 2019, 14:00-14:40

Presence:

  • Basel: -
  • Bochum: Claudius, Jan R., Malte, Miriam, Matthias, Tobias H., Tom
  • Bonn: Christoph, Johannes
  • Groningen: -
  • Stockholm: -
  • Uppsala: -
  • Giessen: -
  • GSI: -

APD-Submodules:

  • Analysis of noise introduction in APD channels via the annealing LEDs and their cablings still going on (Johannes)
  • Suggestions for climate chamber shielding (rubber sealing of door) as done in Bochum will be given (photos, shielding tape type)

VPTT-Submodules:

  • Measurements (estimations) of the free space between front lid and backplane have been done by Clausius/Tobias and Tom, repsectively: 322-324 mm.
  • The routing of the front cooling line was choosen according to the maximum free space between front lid and submodules, a drawing will be given to Bonn (Christoph)

SADC-Crates:

  • The situation of SADC redesign work at KVI is still unclear, no reply from Myroslav or Rick.
  • Maybe Ulrike is able to get an answer...

-- ThomasHeld - 15 Oct 2019
Topic revision: r2 - 30 Oct 2019, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)