Minutes of the Forward Endcap EMC Meeting, 4th of May 2026, 14:00 - 14:25
4 out of 6 dismantled, repaired and reassembled submodules test good (the 2 remaining ones still need to be tested)
The 2 submodules with exchanged carbon alveoles test good in one case, in the other one 2 channels show less response than before
HV board calibration in Bonn: The boards for the 8-crystal submodules are finished testing, now modification of screening to 16-crystal boards
Bonn colleagues found a suitable storage room for the bulky chiller parts still located at RUB. A final permission to occupy that room is missing before really do the move (transport by external company)
The new fornt lid for the INSIGHT experiment setup will be done by TM Lasertechnik, Bochum. A new frame needs to be manufactured as well as the one we have is not separable from the current front lid
May 28th: INSIGHT Inauguration Meeting, FTD Bonn
Tobias H. will give detailed APD creening data to Bonn (Christian) in order to check for swapped APDs in certain submodules