Minutes of the Forward Endcap EMC Meeting, 4th of May 2026, 14:00 - 14:25

  • 4 out of 6 dismantled, repaired and reassembled submodules test good (the 2 remaining ones still need to be tested)
  • The 2 submodules with exchanged carbon alveoles test good in one case, in the other one 2 channels show less response than before
  • HV board calibration in Bonn: The boards for the 8-crystal submodules are finished testing, now modification of screening to 16-crystal boards
  • Bonn colleagues found a suitable storage room for the bulky chiller parts still located at RUB. A final permission to occupy that room is missing before really do the move (transport by external company)
  • The new fornt lid for the INSIGHT experiment setup will be done by TM Lasertechnik, Bochum. A new frame needs to be manufactured as well as the one we have is not separable from the current front lid
  • May 28th: INSIGHT Inauguration Meeting, FTD Bonn
  • Tobias H. will give detailed APD creening data to Bonn (Christian) in order to check for swapped APDs in certain submodules
-- ThomasHeld - 2026-05-20
Topic revision: r1 - 2026-05-20, ThomasHeld
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Panda Wiki Send feedback | Imprint | Privacy Policy (in German)