Minutes of the Forward Endcap EMC Meeting, 27th of May 2024, 14:00 - 14:20

Christoph: Interior wood paneling finished. 2nd offer for transportation received. Attachment points on the frame -> check Colienne documents.
Claudius: Date for cooling transport to Bochum in June not yet planned. Racks will be transported to Bonn.
Bauhaus scaffolding belongs to Bochum, can go to Bonn.
Christoph: Cooling maintenance in Bochum, box for trolleys, piping?
Claudius: Available material at Bochum: stainless steel pipes 6m long, electrically controllable valves, flow meter, new vacuum pump. Flanges not available.
Transportation of Alveoli: Approx. 20 modules, some still to be repaired. Insurance must be obtained.
Tobias H.: Test stand for alveoli not yet back in operation. Some individual parts have been repaired and assembled (approx. 10).

Fritz-Herbert: DAQ workshop 26th of JuneCB-ELSA DAQ integration: Christoph or Jan will present
EMC session 24. June, please sent talk requests.

Travel money from EU for PANDA meeting/DAQ workshop available, ask Fritz-Herbert.

-- FritzHerbertHeinsius - 2024-05-27
Topic revision: r1 - 2024-05-27, FritzHerbertHeinsius
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Panda Wiki Send feedback | Imprint | Privacy Policy (in German)