Minutes of the Forward Endcap EMC SADC Crate Design Vibe/eZuce meeting, 24th of February 2020, 14:00-14:30

Presence:

  • Bochum: Matthias, Claudius, Fritz-Herbert, Malte, Jan, Tobias, Miriam
  • Basel: -
  • Bonn: Christoph, Ulrike, Johannes
  • Groningen: -
  • Uppsala: Pawel
  • Giessen: Markus

Data Concentrator, PS (Pawel)

  • Work continues at lab on Data concentrator parts and tests
  • KVI approved the beam time for irradiation of the SADC power supply
  • The PS prototype and SADCs werde received in Bochum. Tests pending due to University shut down

Cables (Christoph)

  • Signal cables: There is no space for an extra length. Should one built a mockup of part of the insulation? Check cables just before final gluing with an option to change longer/shorter cables?
  • HV cable from the patch panels to the PCBs inside the forward endcap: length was taken from CAD, should update the numbers (Claudius check with Jost)? How much space can be used within the rack? Recommendation not to use full depth.
  • HV cable from patch panels at magnet crates to the racks in E10: One end is crimped. Update length with newest hall building CAD (Claudius check with Jost)

-- FritzHerbertHeinsius - 23 Mar 2020
Topic revision: r2 - 2020-03-25, FritzHerbertHeinsius
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Panda Wiki Send feedback | Imprint | Privacy Policy (in German)