Work continues at lab on Data concentrator parts and tests
KVI approved the beam time for irradiation of the SADC power supply
The PS prototype and SADCs werde received in Bochum. Tests pending due to University shut down
Cables (Christoph)
Signal cables: There is no space for an extra length. Should one built a mockup of part of the insulation? Check cables just before final gluing with an option to change longer/shorter cables?
HV cable from the patch panels to the PCBs inside the forward endcap: length was taken from CAD, should update the numbers (Claudius check with Jost)? How much space can be used within the rack? Recommendation not to use full depth.
HV cable from patch panels at magnet crates to the racks in E10: One end is crimped. Update length with newest hall building CAD (Claudius check with Jost)