200 drilled APD capsules are ready for pickup in Bonn
200 stripped coax signal cables sonn to be ready (need to repair broken knife on cable stripper), pickup together with capsules (plus more material exchange) next week(?)
BN bachelor student working on comparison of SADC readout vs. Bonn readout of the cosmics submodules test stands
HV trimming boards: 5 boards existing, working, need to be rechecked for radiation hardness at Strahlenzentrum GI (~500 Gy)