Production is running smoothly at a rate of 5 modules a week
Bonn is going on with cosmics test measurements of delivered submodules
Concerning the 8-crystal modules we need to make sure that crystals do not change position in the endcap while renumbering/rearranging crystal labeling. The individual crystal position is radiation hardness driven!
Question to KVI: Are there more detailed step drawings of the 8-crystal submodules?
Concerning the installation in Juelich: Is the KVI mountimg tool adapter still available? (Will ask Rick)
SADC crates:
Finaliziation of design needs complete knowledge of back plane PCB design (waiting for Pawel to finish)