Minutes of the forward endcap EMC SeeVogh meeting, 9th of May 2016, 14:00-14:45
Presence:
Basel: Werner
Bochum: Fritz-Herbert, Malte, Matthias, Tom
Bonn: Christoph
Groningen: -
Stockholm: Karoly, Markus
Uppsala: Pawel
GSI: -
APD preamp:
Recent calculations based on beam time data and comparison with VPTT readout led to the unpleasant result of needing a preamp gain about three times lower than the latest test preamps
This intensifies the ringing/oscillation problems with the APD preamps - is it possible to stay with the current preamp design and further reduce gain while getting the amps stable?
Read out electronics:
Malte reported about the problem of not having the possibility to pre-trigger in the low gain branch, so one cannot determine a baseline there
Double peaks occur in the high gain branch when for example charge injection is used -> biasing even if we record waveforms. The cause is an oscillation ('hum') in the high gain branch modulating the waveform.
Pawel: original Uppsala firmware had all those feature necessary to efficiently set thresholds etc.
Obviously the KVI firmware/feature extraction does not
Markus/Pawel measured linearity of the ADCs: "okay"
HV regulation:
Current measurement capability can be realized using four transistors and some resistors which is quite space consuming
After some discussion we decided to skip the current measurement capability and only go for an HV regulation (setting and measuring)
Christoph will prepare a modified patch panel board with attached piggy-back HV regulation board to test mounting on the backplane in Bochum