Minutes of the forward endcap EMC SeeVogh meeting, 1st of February 2016, 14:00-15:00
Presence:
Basel: Werner
Bochum: Fritz-Herbert, Malte, Matthias, Tom, Cathrina, Tobias, Stephan, Patrick
Bonn: Matthias
Groningen: excused
Stockholm: Karoly, Markus
Uppsala: Pawel
GSI: -
'Bonn' VPTT subunit:
The VPTT subunit arrived at Bonn and is going to be installed
Basel preamps:
Four pieces of the new preamp version arrived in Bochum and have been tested
There is a strange oscillation: ~40 MHz high level (open input), ~20 MHz high level (charge injection input), ~10 MHz low level (real APD signal input)
We need to figure out the cause of the oscillation and the differing observations in Basel and Bochum
Readout electronics:
The ADC board from Poland arrived at Uppsala
Optical link capability tests promising - probably frequency increase over 2 GHz possible
Versatile Link group (CERN): possible to place orders (500 pieces already)
Stockholm group: going to work with ChipScope using analog input signals (LaBr)
There is manpower missing in Uppsala to work on a 'laboratory readout solution' with Zynq-SoCs, maybe one finds a master student interested in this work outside Uppsala (Bochum?)
Forward Endcap mechanical assembly:
Almost all Swagelok hoses arrived
Drawings for stainless steel coolant distributor 'bones' almost finished, will be sent to KVI this week for manufacturing cost estimation (and hopefully production)