Minutes of the forward endcap EMC eZuce SRN meeting, 3rd of July 2017, 14:00-14:40

Presence:

  • Basel: Werner
  • Bochum: Cathrina, Claudius, Fritz-Herbert, Matthias, Malte, Miriam, Tobias T.,Tom
  • Bonn: Christoph, Ulrike
  • Groningen: Myroslav
  • Stockholm: -
  • Uppsala: Pawel
  • Giessen: Hans
  • GSI: -

Production Readiness Review:

  • We will have the Production Readiness Review for the VPTT subunits on Friday 14th of this month:
    • The technical coordinators Lars and Tassos and external expert Herbert Loehner will do the review
    • The agenda comprises talks from Bochum and Bonn colleagues
    • Barrel colleagues Hans and Markus will also attend

SADCs:

  • Backplane: design work not yet finished
  • Cabling to backplane forseen similar as on SADC: Pitch-adapter plus connector (Christoph)
  • Basically 1:1 feed throughs
  • No sophisticatd cabling with respect to load distribution necessary, instead 1:1 cabling
  • Power supplies will sit on separate PCBs, not directlt on backplate (distance form the DC/DC converters to signal lines)

SFPs:

  • 2 SFPs irradiated at KVI with 6*10^10 protons per cm^2 fluence
  • Standard SFPs fully satisfying for PANDA phase 1
  • Versatile Links replacing standard SFPs after phase 1 (or from the beginning if possible)
  • Versatile Link irradiation beam time at KVI in September

Subunits:

  • Decided to buy Stycast 1266 cryo epoxy and test it for suitability (wrt to viscosity) for insert to alveole glueing

APD preamps:

  • About 300 pieces currently under test in Basel
  • Wait for a larger batch to ship to Bochum (no need to have it there now) -- ThomasHeld - 13 Jul 2017
Topic revision: r1 - 13 Jul 2017, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)