Minutes of the mvd ezuce- Wednesday, June 27 2018 Partecipants: Tobias, Hans, Gianni and Daniela - information from fee/daq workshop The numbers for the MVD were presented (Hans) However it is important not to give only the maximum values for the occupancy, but to inform about both average values and high spots, with channels number. We have to check these numbers in the TDR. - On the other side Tobias will evaluate numbers with new simulations useful as input for tuning the Toast circuit. Gianni debugged the digital part developed for Toast with the simulation file already provided by Tobias (simulation based on 20 MHz interactions, background and interactions with materials included, digi information, no noise from sensors and electronics). The rate/strip is not so high, however less than the foreseen 40 MHz. A new check will be done. Header and trailer parts are now included in Toast. Concerning the slow control all the detectros will be required to present (in November, at the PANDA meeting ?): perspectives plan (also no plan!) strategy Tobias inform about a presentation by Pavel concerning data concentrators that could be interesting also for the mvd ( https://indico.gsi.de/event/7173/session/6/contribution/11/material/slides/0.pptx)