You are here: PANDA Wiki>STT Web>WebHome (revision 22)EditAttach

PANDA Straw Tube Tracker (STT)

Welcome to the home of PANDA Wiki.STT. This is a web-based collaboration area for the PANDA Straw Tube Tracker group.

For further informations please contact Peter Wintz.

-- PeterWintz.

Public information

General description of the central PANDA Straw Tube Tracker (STT). The Technical Design Report of the STT has been approved (Jan 2013) after an evaluation by the Expert Committee Experiments at FAIR and is published. A recent summary talk about the PANDA Straw Tube Tracker was given at the LEAP 2013 conference. More talks and publications can be found in the Publication list.

STT group (Germany-Italy-Poland-Romania-U.S.A.):
IFIN-HH Bukarest-Magurele, AGH Cracow, Jagiell. Univ. of Cracow, IFJ PAN Cracow, GSI Darmstadt, Northwestern Univ. Evanston, INFN and Univ. of Ferrara, INFN Frascati, INFN and Univ. of Pavia, and FZ Juelich.

Internal information

News

  • Dec-1st, 2014: 3rd beam test week started. Proton beam, requested momenta: 2.0, 1.3, 1.0 GeV/c. In addition 0.8 GeV/c.
  • Oct-13th, 2014: Start of 2nd beam test week in 2014. Date has been updated (one week earlier now, change with MVD test week).
  • July-18th, 2014: Start of first beam test week in 2014. Successfully completed.
  • Jan - to date, 2014: Ongoing preparations of straws and readout systems with cosmic test measurements.
  • Dec-1/8, 2013: Setup of straw testsystem with ASIC+TRBv3 DAQ at COSY (Cracow/Juelich).
  • Oct/Nov, 2013: Tests for analog amplifier + cabling design for FADC readout ongoing.
  • Oct/Nov, 2013: Precise measurement of straw mechanics (pressurized length, diameter) ongoing.
  • Sep 2013: First straw productions with (final) mylar tubes started. Leakage tests sucessfull.

Beam tests

Beam times allocated for STT tests in 2014 (at COSY, Juelich):
  • 1 week, starting July-18th (cw 30), protons at 3.0, 0.8, 0.6 GeV/c. Setup at BigKarl beam area at COSY.
  • 1 week, starting Oct-13th (cw 42), deuterons at 2.0, 1.3, 1.0 GeV/c
  • 1 week, starting Dec-1 (cw 49), protons at 2.0, 1.3, 1.0 GeV/c

Beam weeks are from friday-friday or monday-monday. The COSY beam time schedule can be found here: COSYSchedule2014.pdf

STT workshops & meetings

During the regular PANDA collaboration meeting the STT group meets in the Tracking session (TRK)

Site Tools of the STT Web

Notes:

  • You are currently in the STT web. The color code for this web is this background, so you know where you are.
  • If you are not familiar with the PANDA Wiki collaboration platform, please visit WelcomeGuest first.
Topic attachments
I Attachment Action Size Date Who Comment
Beamtest-July2014_sel1.JPGJPG Beamtest-July2014_sel1.JPG manage 2963.4 K 29 Jul 2014 - 14:15 PeterWintz  
COSYSchedule2014.pdfpdf COSYSchedule2014.pdf manage 17.5 K 27 Mar 2014 - 15:16 PeterWintz COSY beam time schedule 2014
PW_130613_LEAP.pptxpptx PW_130613_LEAP.pptx manage 9259.3 K 01 Nov 2013 - 00:42 PeterWintz Summary talk about the PANDA Straw Tube Tracker
Edit | Attach | Print version | History: r24 | r23 < r22 < r21 < r20 | Backlinks | View wiki text | Edit WikiText | More topic actions...
Topic revision: r22 - 04 Dec 2014, PeterWintz
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)