*[[http://www-panda.gsi.de][PANDA]]* : *[[WebHome][Magnet]]* : *[[%TOPIC%]]* <h2>Tasks and Responsibilities</h2> <P> The two large spectrometer magnets are built by seven groups from universities and research institutes in Germany, Italy, Russia, Poland and the UK. The institutions and their abbreviations are listed in Table <A HREF="#t:orga:inst">1</A>. <P> <BR><P></P> <DIV ALIGN="CENTER"><A NAME="15"></A> <TABLE> <CAPTION><STRONG>Table 1:</STRONG> Table of abbreviations and institutions responsible for the design and construction of the magnets at PANDA.</CAPTION> <TR><TD> <DIV ALIGN="CENTER"> <TABLE CELLPADDING=3 BORDER="1" ALIGN="CENTER"> <TR><TD ALIGN="LEFT">Abr.</TD> <TD ALIGN="LEFT">Institution</TD> </TR> <TR><TD ALIGN="LEFT">CUT</TD> <TD ALIGN="LEFT">Cracow University of Technology,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Kraków, Poland</TD> </TR> <TR><TD ALIGN="LEFT">FZJ</TD> <TD ALIGN="LEFT">Forschungszentrum Jülich,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Jülich, Germany</TD> </TR> <TR><TD ALIGN="LEFT">Gla</TD> <TD ALIGN="LEFT">University of Glasgow,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Glasgow, United Kingdom</TD> </TR> <TR><TD ALIGN="LEFT">GSI</TD> <TD ALIGN="LEFT">Gesellschaft für Schwerionenforschung,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Darmstadt, Germany</TD> </TR> <TR><TD ALIGN="LEFT">INFN</TD> <TD ALIGN="LEFT">INFN, Sezione di Genova,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Genova, Italy</TD> </TR> <TR><TD ALIGN="LEFT">JINR</TD> <TD ALIGN="LEFT">Joint Institute for Nuclear Research,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Dubna, Russia</TD> </TR> <TR><TD ALIGN="LEFT">UJ</TD> <TD ALIGN="LEFT">Jagiellonian University,</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Kraków, Poland</TD> </TR> </TABLE> </DIV> <A NAME="t:orga:inst"></A></TD></TR> </TABLE> </DIV> <h3>List of Workpackages</h3> <P> Five distinct primary work packages have been identified. These comprise the design and construction of the following items. <OL> <LI>The coil and cryostat of the Target Spectrometer. The overall responsibility is taken by INFN, Genoa. </LI> <LI>The flux return yoke of the Target Spectrometer, which serves simultaneously as multi-layer absorber for a large-angle muon detection system. The overall responsibility is taken by JINR, Dubna. </LI> <LI>The large-aperture dipole magnet for the Forward Spectrometer. The overall responsibility is taken by the University of Glasgow. </LI> <LI>The support structures and detector mountings for all of the Forward Spectrometer. The overall responsibility is taken jointly by the Jagiellonian University, Cracow (UJ) and the Cracow University of Technology (CUT) </LI> <LI>The railing systems and movement of the whole Target Spectrometer and the platform with the Forward Spectrometer detectors. The overall responsibility is taken jointly by the Gesellschaft für Schwerionenforschung, Darmstadt (GSI) and Cracow University of Technology (CUT). </LI> </OL> The responsibility for the detector mountings inside the Target Spectrometer remains with the individual detector groups, while the magnet group will provide only mounting points. A detailed list of work packages has been worked out, and responsibilities have been identified, which have been approved by all groups. These are listed in Table <A HREF="#t:orga:wp">2</A>, where the responsible institutions are listed by their abbreviations specified in Tablee <A HREF="orga.html#t:orga:inst">1</A>. Where responsibilities are shared the main responsible is given first and the secondary is indicated in brackets. The main responsible institution will always supervise the work package and take responsibility for a timely and full completion. <P> <BR><P></P> <DIV ALIGN="CENTER"><A NAME="54"></A> <TABLE> <CAPTION><STRONG>Table 2:</STRONG> Table of work packages listing the individual work packages and the responsible institutions by the abbreviations as listed in Table <A HREF="#t:orga:inst">1</A>. The institutions listed in brackets are responsible for a specific part of the WP but the overall responsibility is taken by the leading institution.</CAPTION> <TR><TD> <DIV ALIGN="CENTER"> <TABLE CELLPADDING=3 BORDER="1" ALIGN="CENTER"> <TR><TD ALIGN="LEFT" COLSPAN=2>Task</TD> <TD ALIGN="CENTER">Responsible</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Instrumented Flux Return</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Design, documentation, tender, supervision of construction</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Material procurement, manufacturing, assembly and transport preparation</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Assembly and tests at company</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Transport to FAIR</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Interface for muon system</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Coil & Cryostat</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Cold mass cooling circuit design</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Selection of cable</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Mandrel and winding (spacers, connectors...) design</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Mechanical suspension of the cold mass in the cryostat</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Design of intermediate temperature shields</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Feed lines and turret</TD> <TD ALIGN="CENTER">INFN(FZJ)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Coil Protection system</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Coil diagnostic and DAQ</TD> <TD ALIGN="CENTER">INFN(GSI)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Tender and procurement</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Follow-up of the cable procurement & tests</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Follow-up of the coil construction</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Follow-up of the cryostat construction</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Follow-up of the cryogenic turret feed lines</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Coil, cryostat, turret final assembly at manufacturer site</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Cryogenic and electric tests at company</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Transport to FAIR</TD> <TD ALIGN="CENTER">INFN</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Dipole Magnet</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Final dipole design</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Procurement and quality assurance (no assembly)</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Dipole slow control</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Detector Support Structures</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Platform for the FS detectors</TD> <TD ALIGN="CENTER">CUT</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Supports in the dipole magnet gap</TD> <TD ALIGN="CENTER">CUT</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Wire chamber supports of the FS</TD> <TD ALIGN="CENTER">UJ</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Absorber system for muon filtering between TS and FS</TD> <TD ALIGN="CENTER">CUT</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Magnet Support Structures</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Rail system and moving of solenoid</TD> <TD ALIGN="CENTER">GSI(CUT)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Solenoid support structure</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Dipole support structure</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="CENTER" COLSPAN=3><B>Assembly and Commissioning at FAIR</B></TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Assembly of yoke and support structures</TD> <TD ALIGN="CENTER">JINR</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Installation of cryostat and supply lines</TD> <TD ALIGN="CENTER">INFN (JINR)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Assembly of dipole magent and power supply</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Alignment of magnets</TD> <TD ALIGN="CENTER">GSI (FZJ)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Commissioning of solenoid</TD> <TD ALIGN="CENTER">INFN (JINR)</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Commissioning of dipole</TD> <TD ALIGN="CENTER">Gla</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Field mapping for both magnets</TD> <TD ALIGN="CENTER">GSI</TD> </TR> <TR><TD ALIGN="LEFT"> </TD> <TD ALIGN="LEFT">Assembly of detector supports in the FS</TD> <TD ALIGN="CENTER">CUT(UJ)</TD> </TR> </TABLE> </DIV> ---++ ____________________________ *[[http://www-panda.gsi.de][PANDA]]* : *[[WebHome][Magnet]]* : *[[%TOPIC%]]* -- Created by Main.IntiLehmann - 18 Sep 2007
This topic: Magnet
>
WebHome
>
TasksResponsibilities
Topic revision:
04 Apr 2009,
IntiLehmann
(raw view)
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki?
Send feedback
Imprint (in German)
Privacy Policy (in German)