Minutes of the Forward Endcap EMC Vibe/eZuce meeting, 30th of November 2020, 14:00-15:00

Presence:

  • Bochum: Claudius, Fritz-Herbert, Matthias, Miriam, Tobias H., Tobias T., Sebastian, Tom
  • Basel: -
  • Bonn: Christoph, Johannes, Ulrike
  • Groningen: -
  • Uppsala: Pawel
  • Giessen: Hans Georg, Markus

Submodule Lengths vs. Front Cooling:

  • Measurements of Submodule lengths and free space between backplate and front lid reveal 2 mm of 'clashing zone' at the very narrowest points between submodules and front cooling pipes
  • Ether the tube size has to be decreased (which would alter the coolant flow unless we double the pipe numbers and would mean we need a different pipe baking mould) or the submodules need to move closer to the backplate (as close as the original design says)
  • Christoph will talk to the Bonn workshop and ask for the possibility of milling 2 mm off all (or at least just the relevant) interface pieces

Transportation Issues:

  • First delivery to Jülich and next delivery to Bonn both combined to be on December 17th. There needs to be enough suitable packaging material in Bochum first (sent by Bonn colleagues)
  • Cushioning of transport boxes needs to be improved: Exclusive use of Bonn cushion system ('hard foam' pices cut to shape)
  • The is also a new source of cheap yet reliable looking boxes we will try (ordered)
  • As the latest transport to Bonn impressively showed additional securing mechanisms are needed to prevent submodules from moving inside the boxes during hard braking of the transportation vehicle: Idea of chamfered plastic cylinder to be pressed into transportation tool handle acting as a stop

-- Main. ThomasHeld - 01 Dec 2020

This topic: EMC > WebHome > ForwardEndcapMeetings > Minutes2020-11-30
Topic revision: 2020-12-10, ThomasHeld
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Panda Wiki Send feedback | Imprint | Privacy Policy (in German)