Minutes of the Forward Endcap EMC SADC Crate Design Vibe/eZuce meeting, 24th of February 2020, 14:00-14:30

Presence:

  • Bochum: Matthias, Claudius, Fritz-Herbert, Malte, Jan, Tobias, Miriam
  • Basel: -
  • Bonn: Christoph, Ulrike, Johannes
  • Groningen: -
  • Uppsala: Pawel
  • Giessen: Markus

Data Concentrator, PS (Pawel)

  • Work continues at lab on Data concentrator parts and tests
  • KVI approved the beam time for irradiation of the SADC power supply
  • The PS prototype and SADCs werde received in Bochum. Tests pending due to University shut down

Cables (Christoph)

  • Signal cables: There is no space for an extra length. Should one built a mockup of part of the insulation? Check cables just before final gluing with an option to change longer/shorter cables?
  • HV cable from the patch panels to the PCBs inside the forward endcap: length was taken from CAD, should update the numbers (Claudius check with Jost)? How much space can be used within the rack? Recommendation not to use full depth.
  • HV cable from patch panels at magnet crates to the racks in E10: One end is crimped. Update length with newest hall building CAD (Claudius check with Jost)

-- FritzHerbertHeinsius - 23 Mar 2020
Topic revision: r2 - 25 Mar 2020, FritzHerbertHeinsius
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)