Minutes of the forward endcap EMC eZuce SRN meeting, 8th of October 2018, 14:00-14:20

Presence:

  • Basel: -
  • Bochum: Fritz-Herbert, Cathrina, Claudius, Fritz-Herbert, Malte, Matthias, Tobias H., Tobias T., Tom
  • Bonn: Christoph, Ulrike
  • Groningen: Myroslav
  • Stockholm: -
  • Uppsala: -
  • Giessen: Markus
  • GSI: -

VPTT Submodule Production:

  • Production is running smoothly at a rate of 5 modules a week
  • Bonn is going on with cosmics test measurements of delivered submodules
  • Concerning the 8-crystal modules we need to make sure that crystals do not change position in the endcap while renumbering/rearranging crystal labeling. The individual crystal position is radiation hardness driven!
  • Question to KVI: Are there more detailed step drawings of the 8-crystal submodules?
  • Concerning the installation in Juelich: Is the KVI mountimg tool adapter still available? (Will ask Rick)

SADC crates:

  • Finaliziation of design needs complete knowledge of back plane PCB design (waiting for Pawel to finish)

-- ThomasHeld - 26 Oct 2018
Topic revision: r1 - 26 Oct 2018, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)