Minutes of the forward endcap EMC eZuce SRN meeting, 2nd of July 2018, 14:00-15:00

Presence:

  • Basel: -
  • Bochum: Cathrina, Jan, Malte, Matthias, Miriam, Tobias T., Tom
  • Bonn: Christoph, Ulrike
  • Groningen: -
  • Stockholm: -
  • Uppsala: Pawel
  • Giessen: Hans, Markus
  • GSI: -

VPTT Submodule Production:

  • Submodule production is ongoing with high throughput (4-5 submodules per week)
  • Two more damaged VPTTs: one tube with loose dynode grid (2nd time this occurs), one tube with damaged pumping port (loss of vacuum)
  • For replacing the damaged tubes we decided to not force a new matching with the current constraints but to replace with reasonably close measuring tubes (gain, skb, gain change with HV)
  • A list of measured tube gain changes as a function of the high voltage applied will be prepared by Christoph within this week
  • 1st regular delivery day is August 28th: 5 boxes (5 submodules) will be shipped to Bonn by the Bochum University "Fahrdienst", an appropriate transportation insurance is contrated (also covering transportation from Bonn to Juelich)
  • Transportation to Juelich has to be worked out in detail; a transport of cosmics tested units from BN to JUL on the same day as delivery of new build units from BO to BN is obvious. However, delivery to a radiation controlled area on a secured research center site is probably some more complicated...
  • We will discuss this at an onsite meeting in Juelich where also the submodule storage situation in the TOF hall will be clarified

SADC Crates: Signal Cable Connection

  • A design of the signal cable connection to the SADC crate backplane was presented by Christoph
  • Pawel mentioned, the design has to be adopted to the crate 'rail' design of leading and supporting the cable-to-plug pcb (extension of pcb on top and bottom)

APD HV Regulation:

  • Christoph presented different pattern of HV distribution within one submodule and its implications in case of a HV input failure (corresponding to 8 regualted channels)
  • Would a continues failing region or several spots of single APD failures to be preferred?
  • We saw no real reason to decide for a specific schema. Hans mentioned the low probability of such a total HV input failure or the need of swiching off the input.
  • Staying with the one pattern already worked out by Christoph would save any further man power on this topic

APD Screening:

  • A first batch of screened APDs was sent to Giessen
  • Irradiation may occur this week as long as the radiation officer in the Strahlenzentrum is available

-- ThomasHeld - 15 Aug 2018
Topic revision: r1 - 16 Aug 2018, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)