Minutes of the forward endcap EMC eZuce SRN meeting, 29th of January 2018, 14:00-15:15

Presence:

  • Basel: Werner
  • Bochum: Cathrina, Fritz-Herbert, Malte, Matthias, Miriam, Tobias H, Tobias T., Tom
  • Bonn: Christoph, Merlin, Ulrike
  • Groningen: -
  • Stockholm: -
  • Uppsala: Pawel
  • Giessen: Hans
  • GSI: -

VPTT Submodule Production:

  • There was a discussion how to proceed in the vptt submodule restart of production
  • Now, that the preamps gain of the already glued units is indirectly determined we should check whether the new component assignment leads to the neccessary and expected homogeneity in response within a submodule
  • We there fore should wait for the latest optimization from Bonn and start with a subunit containg both dircetly and indirectly determined preamp gains and see if the result is as satisfying
  • We need a solution for regular transportation of submodules from Bochum to Bonn

SADC Crate Backplane:

  • There was a discussion where on the backplane pcb to place which connectors and the power supply
  • Pawel explained, that an SFP connector and/or a versatile link would be desirable to have on the backplane pcb
  • To what extend will the power supplies reach in the direction perpendicular to the backplane?

APD irradiation:

  • The APDs that have been screened for the preparation of the PRR II meeting arrived in Giessen for a second irradiation session for diagnostics
-- ThomasHeld - 09 Feb 2018
Topic revision: r1 - 09 Feb 2018, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)