Minutes of the forward endcap EMC eZuce SRN meeting, 19th of June 2017, 14:00-14:30

Presence:

  • Basel: Werner
  • Bochum: Cathrina, Claudius, Fritz-Herbert, Matthias, Malte, Miriam, Tobias T.,Tom
  • Bonn: Christoph
  • Groningen: Myroslav
  • Stockholm: -
  • Uppsala: Pawel
  • Giessen: excused
  • GSI: -

Beam time at KVI:

  • Myroslav offered short term beam time at KVI for proton irradiation tests of light pulser and THMP components (done on June 28th/29th)
  • More KVI proton beam tests foreseen (Pawel: Versatile Link components, Giessen: Barrel crystals)

VPTT capsules:

  • Problems with mountability of recovery LED cut out VPTT capsules
  • Thinking of 4 crystal-plastic-spacer to replace capsules of 4 crystals each
  • In the meantime the problems turned out to be caused by bad manufactured VPTT capsules - there have been similar problems with the APD capsules which led to a new production run back then, in case of the VPTT capsules the faults are less obvious
  • Sorting out the bad capsules allows going back to the original design, even cut out for recovery LED no longer needed
-- ThomasHeld - 30 Jun 2017
Topic revision: r1 - 30 Jun 2017, ThomasHeld
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)