Minutes of the forward endcap EMC SeeVogh meeting, 1st of February 2016, 14:00-15:00

Presence:

  • Basel: Werner
  • Bochum: Fritz-Herbert, Malte, Matthias, Tom, Cathrina, Tobias, Stephan, Patrick
  • Bonn: Matthias
  • Groningen: excused
  • Stockholm: Karoly, Markus
  • Uppsala: Pawel
  • GSI: -

'Bonn' VPTT subunit:

  • The VPTT subunit arrived at Bonn and is going to be installed

Basel preamps:

  • Four pieces of the new preamp version arrived in Bochum and have been tested
  • There is a strange oscillation: ~40 MHz high level (open input), ~20 MHz high level (charge injection input), ~10 MHz low level (real APD signal input)
  • We need to figure out the cause of the oscillation and the differing observations in Basel and Bochum

Readout electronics:

  • The ADC board from Poland arrived at Uppsala
  • Optical link capability tests promising - probably frequency increase over 2 GHz possible
  • Versatile Link group (CERN): possible to place orders (500 pieces already)
  • Stockholm group: going to work with ChipScope using analog input signals (LaBr)
  • There is manpower missing in Uppsala to work on a 'laboratory readout solution' with Zynq-SoCs, maybe one finds a master student interested in this work outside Uppsala (Bochum?)

Forward Endcap mechanical assembly:

  • Almost all Swagelok hoses arrived
  • Drawings for stainless steel coolant distributor 'bones' almost finished, will be sent to KVI this week for manufacturing cost estimation (and hopefully production)

-- ThomasHeld - 17 Feb 2016
Topic revision: r1 - 17 Feb 2016, ThomasHeld
 