Minutes of the forward endcap EMC SeeVogh meeting, 22nd of June 2015, 13:30-14:30

Topics are not necessarily in the order of discussion, but by subject.

Presence:

  • Basel: excused
  • Bochum: Claudius, Fritz-Herbert, Malte, Miriam, Patrick, Tobias H., Tom
  • Bonn: Christoph
  • Groningen: excused
  • Uppsala: Pawel
  • GSI: -

Bonn VPTT subunit cosmics setup:

  • Mis-mapping corrected now
  • 15 of the total 16 channels look okay (1 trigger szintillator not okay)
  • 16-channel plot shown (cosmics spectra with Landau-fits)
  • What we see is what was estimated from a subsample already:
    • Cosmics peak is between 150 and 200 ADC counts (corresponding to the 145/185 mV/GeV estimated by Bonn people earlier).
    • This is much more than the gain spread of the VPTTs involved!
    • Reason unknown, maybe damaged crystal coverings (mirror foil).
  • Total recording time up to now: 54 hours
  • Trigger problem just occurred again (reason unknown)
  • Agreed to change setup to include shapers in read out chain

Mechanics:

  • Interface pieces in production now (Bonn)
  • Distributed production to two workshops (8 crystal and 16 crystal interfaces separately)
  • First test pieces in Bonn (may bring one to Bochum)
  • Ordering for SADC crates submitted to KVI (waiting for delivery)

ADCs:

  • Balancing filtering between analog (shaper) and digital signal manipulation
  • Digital filtering also capable of reducing input amplifier noise
  • Tests ongoing how to best cope with fast rising Basel preamp signals with respect to energy and time resolution
  • Question to Bochum whether to buy a current version ADC board: no funding right now (~4.5 kEUR)
Topic revision: r2 - 23 Jun 2015, ChristophSchmidt
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)