PANDA TAG TrackingMinutes for 4th of September:Top 1: Benchmark Channels: | ||||||||
Changed: | ||||||||
< < | Fabian presented the chosen benchmark channels (see attached pdf-file of the presentation); in the following discussion some points have been mentioned: | |||||||
> > | The chosen benchmark channels has been presented (see attached pdf-file of the presentation); in the following discussion some points have been mentioned: | |||||||
| ||||||||
Line: 17 to 17 | ||||||||
Top 2: Questions to the SimulationsMVD: | ||||||||
Changed: | ||||||||
< < | Fabian presented a first draft of the questions to the simulations for the MVD. Here the vertexing capabilities of close displaced decays vertices for D-mesons are one important issue. Especially the requirement of a quasi online detection of such events to allow a high level open charm trigger is quite challenging, not only for the MVD. Moreover the tracking of leptons coming from the J/Psi decays in pbar - nuclei reaction defines the performance of the MVD in multi-track environment. More details can be found in Fabian's presentation. The shown material have now be re-arranged and enhanced according the already mentioned considerations. | |||||||
> > | A first draft of the questions to the simulations for the MVD has been given. Here the vertexing capabilities of close displaced decays vertices for D-mesons are one important issue. Especially the requirement of a quasi online detection of such events to allow a high level open charm trigger is quite challenging, not only for the MVD. Moreover the tracking of leptons coming from the J/Psi decays in pbar - nuclei reaction defines the performance of the MVD in multi-track environment. More details can be found in Fabian's presentation. The shown material have now be re-arranged and enhanced according the already mentioned considerations. | |||||||
CT:No presentation, postponed to next VRVS meeting; Paola promised to nomimate a candidate for this work by then. | ||||||||
Line: 26 to 26 | ||||||||
No presentation, postponed to next VRVS meeting.
Top 3: Timeframe discussion | ||||||||
Changed: | ||||||||
< < | Fabian introduced shortly into the timeframe and milestone definition discussion. For the MVD a dedicated MVD meeting has been scheduled for the end of October which deals with definition of R&D tasks and time schedules. More details will be given to the TAG afterwards. | |||||||
> > | After a short introdution into the timeframe and milestone definition discussion more detailed information for the different sub-detectors have been collected. For the MVD a dedicated MVD meeting has been scheduled for the end of October which deals with the definition of R&D tasks and time schedules. More details will be given to the TAG afterwards. | |||||||
For the CT basically both options, either TPC or STT, foresee to finish their R&D and prototype phase by end of 2008. By then a detailed detector proposal for both options will be available which could be the basis for the design decision. However, more detailed time schedules will be discussed in the near future.
For the FT the rough time frame is that by end of 2007 a decision between the Straw and MDC option can be take place. By end of 2008 then the final layout should be ready for the TDR. Also here a more detailed plan should be worked out soon.
Top 4: Any other business and Next meeting | ||||||||
Changed: | ||||||||
< < | We should be able to finalize our work after the December PANDA meeting. Therefore a lot work is needed for all sub-systems. Please use the Wiki page and or the GSI-Forum to distribute these informations among us as soon as possible. Discussions could then either take place via email/forum or during the meetings. | |||||||
> > | We should be able to finalize our work after the December PANDA meeting. Therefore a lot of work is needed for all sub-systems. Please use the Wiki page and or the GSI-Forum to distribute these informations among us as soon as possible. Discussions could then either take place via email/forum or during the meetings. | |||||||
Fabian is in charge to update the draft of our document as soon as possible and distribute it within the TAG. | ||||||||
Changed: | ||||||||
< < | A next VRVS meeting is scheduled for the week of Oct, 9 - Oct, 14 2006. Details will be distributed by Fabian before the meeting. | |||||||
> > | The next VRVS meeting is scheduled for the week of Oct, 9 - Oct, 14 2006. Details will be distributed by Fabian before the meeting. | |||||||
-- FabianHuegging - 13 Sep 2006 |