Difference: 2012April26 (1 vs. 4)

Revision 4
03 May 2012 - Main.RobertoPerezBenito
Line: 1 to 1
 
META TOPICPARENT name="MeetingMinutes"
Group Meeting at Mainz 26th April 2012

Revision 3
26 Apr 2012 - Main.RobertoPerezBenito
Line: 1 to 1
 
META TOPICPARENT name="MeetingMinutes"
Group Meeting at Mainz 26th April 2012

Line: 15 to 15
 
  • Iris:
    • Macro for the pion, muon production in the Himster, 1M event in production.
  • Dexu::
Changed:
<
<
    • Start GiBUU code on the Himster
>
>
    • Start GiBUU code on the Himster
 
    • two kaon decay are not back to back produce. Dexu try to understand this.
Added:
>
>
  • Cristina:
    • Background signal studies (BesIII on e+e- collider)
    • Install simulation in Himster
      • Yue Ask about the resolution difference between PANDA and BesIII?
        • Studies make by Dmitry on the Form factors show is better determine for PANDA (statistical error low than BesIII).
        • Only the Luminosity make the difference.
  • Keith:
    • Preparing a proposal on strange Barion, Omega(3s) and sigma(2s).
    • Analysis on the EMC effect in Deuteron.
      • Keith explain the EMC effect and the difference between the strong and the weak interaction.
 
Added:
>
>
  • Dmitry:
    • install new macro in Himster for studie radiative correction e+e-
    • Put this radiative correction on the event generator is the goal of this studies.

  • Mamen:
    • Waiting for the correction.

  • Manuel:
    • preparing the code to calculate the pbarp going to pi+pi-
    • Cross section is need for the determination of the suppression factor.
 


Home of Mainz Meeting Minutes
Revision 2
26 Apr 2012 - Main.RobertoPerezBenito
Line: 1 to 1
 
META TOPICPARENT name="MeetingMinutes"
Group Meeting at Mainz 26th April 2012

Changed:
<
<
  • Y. Ma : Future Plan
>
>

Meeting minutes
  • Christine:
    • Chiller don't arrive to -25°C due to the compressor
    • It is the possibility to buy a new one or a chiller on exposition for half price.
    • Vacuum workshop find a chiller which arrive to -40°C.
  • Pascal:
    • Flash ADC read by the Data acquisition system and merge on the root file.
    • External trigger for a cosmic muon is under construction.
  • Iris:
    • Macro for the pion, muon production in the Himster, 1M event in production.
  • Dexu::
    • Start GiBUU code on the Himster
    • two kaon decay are not back to back produce. Dexu try to understand this.
 


Home of Mainz Meeting Minutes
Added:
>
>
META FILEATTACHMENT attr="h" comment="yue" date="1335448270" name="future_plan.pdf" path="future_plan.pdf" size="2965896" user="RobertoPerezBenito" version="1.1"
 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)