Difference: Minutes2020-01-13 (1 vs. 2)

Revision 2
21 Feb 2020 - Main.ThomasHeld
Line: 1 to 1
 
META TOPICPARENT name="ForwardEndcapMeetings"

Minutes of the forward endcap EMC Vibe/eZuce meeting, 13th of January 2020, 14:00-14:20

Presence:

Line: 12 to 12
 
  • GSI: -

APD Submodules - LED to APD noise introduction:

  • New results from Bonn inside a different climate chamber show results close to the ones we got in Bochum. A trip to Bonn therefore was cancelled for the time being.
Changed:
<
<
  • Noise introduction seems to be tolerable for the different cabling scenarios (shielded, twisted pairs, unshielded) as long as the power is supply is not connected. In the experiment later on we might need to galvanically disconnect the supply during beam times.
>
>
  • Noise introduction seems to be tolerable for the different cabling scenarios (shielded, twisted pairs, unshielded) as long as the power supply is not connected. In the experiment later on we might need to galvanically disconnect the supply during data taking.
 
  • (In BO twisted pair cabling turned out to be best suitable.)

SADC crate power supplies::

 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding PANDA Wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)