Minutes of the forward endcap EMC Vibe/eZuce meeting, 23rd of September 2019, 14:00-14:40
Presence:
Line: 15 to 15
Suggestions for climate chamber shielding (rubber sealing of door) as done in Bochum will be given (photos, shielding tape type)
VPTT-Submodules:
Measurements (estimations) of the free space between front lid and backplane have been done by Clausius/Tobias and Tom, repsectively: 322-324 mm.
Changed:
< <
The routing of the front cooling line was choosen ccorfing to the maximum free space between front lid and submodules, a drawing will be given to Bonn (Christoph)
> >
The routing of the front cooling line was choosen according to the maximum free space between front lid and submodules, a drawing will be given to Bonn (Christoph)
SADC-Crates:
The situation of SADC redesign work at KVI is still unclear, no reply from Myroslav or Rick.