Minutes of the forward endcap EMC eZuce SRN meeting, 27th of August 2018, 14:00-14:20

>
>

Minutes of the forward endcap EMC eZuce SRN meeting, 10th of September 2018, 14:00-15:20

 

Presence:

  • Basel: -
  • Bochum: Fritz-Herbert, Cathrina, Claudius, Fritz-Herbert, Malte, Matthias, Meike, Miriam, Tobias H., Tobias T., Tom
Line: 14 to 14
 

VPTT Submodule Production:

  • First cosmics test stand results from Bonn: The submodules testes so far are fine, showing maximum channel-wise variations in the +/- 20% regime, most of them in the +/- 10% regime
  • Weekly delivery of submodules from Bonn to Bochum and package material in return works fine
Changed:
<
<
  • Mountplates for the 8 crystal submodules need to get a threaded hole (M3) for the ground pin, the Bonn workshop looks for the clamping tool for fixing the plates on the cad machine
>
>
  • Mountplates for the 8 crystal submodules need to get a threaded hole (M3) for the ground pin, the Bonn workshop looks for the clamping tool for fixing the plates on the cnc machine
 
  • New color codes for the cable bundling in the 8 crystal submodules were proposed
  • There was some discussion (also after the meeting) and we finally agreed to build the 8 cystal submodules all in the same way, with identical crystal numberinmg from '8' to 'F' (instead of the former somewhat inconsitent '0' to '7' numbering) regardless of their later position on the backplate
 