Minutes of the forward endcap EMC meeting, 10th of Novemberr 2014, SeeVogh, 14:00-15:00

Line: 34 to 34
 
  • Ulrike: What is the status of the APDlab measurements? Do we need to irradiate all APDs? Fritz-Herbert: Please ask Andrea about details.

AOT
Changed:
<
<
  • Rauischholzhausen attendance: Myroslav possibly, Bonn: Andrew, Christoph, Bochum: Tom, Matthias, Claudius, Tobias T., Fritz-Herbert
>
>
  • Rauischholzhausen attendance: Myroslav possibly, Bonn: Andrew, Christoph, Bochum: Tom, Claudius, Patrick, Tobias T., Tobias H. , Fritz-Herbert
 

-- FritzHerbertHeinsius - 11 Nov 2014
Revision 4
12 Nov 2014 - Main.FritzHerbertHeinsius
Line: 1 to 1
 
META TOPICPARENT name="ForwardEndcapMeetings"

Minutes of the forward endcap EMC meeting, 10th of Novemberr 2014, SeeVogh, 14:00-15:00

Line: 34 to 34
 
  • Ulrike: What is the status of the APDlab measurements? Do we need to irradiate all APDs? Fritz-Herbert: Please ask Andrea about details.

AOT
Changed:
<
<
  • Rauischholzhausen attendance: Myroslav possibly, Bonn: not possible, Bochum: Tom, Matthias, Claudius, Tobias T., Fritz-Herbert
>
>
  • Rauischholzhausen attendance: Myroslav possibly, Bonn: Andrew, Christoph, Bochum: Tom, Matthias, Claudius, Tobias T., Fritz-Herbert
 

-- FritzHerbertHeinsius - 11 Nov 2014
Revision 3
11 Nov 2014 - Main.FritzHerbertHeinsius
Line: 1 to 1
 
META TOPICPARENT name="ForwardEndcapMeetings"

Minutes of the forward endcap EMC meeting, 10th of Novemberr 2014, SeeVogh, 14:00-15:00

Line: 23 to 23
 
  • Fritz-Herbert: Cables for alveole should be ordered, such that VPTT alveole mass production starts latest in January.

Mechanics
Changed:
<
<
  • Myroslav: RUB got all swagelok connectors from KVI. Rick will sent a list with all required types (and order numbers) in the next few days.
  • Christoph, Tom: Inserts, mount plates and alveoli can be transported to Bochum by car (driver from Bonn University) whenever possible.
>
>
  • Myroslav: RUB got all swagelok connectors from KVI. Action: Rick will sent a list with all required types (and order numbers) in the next few days.
  • Christoph, Tom: Action: Inserts, mount plates and alveoli can be transported to Bochum by car (driver from Bonn University) whenever possible.
 
  • Myroslav on crate design: New ADC has components on both sides. Will work on how to cool in the next few weeks.
  • Claudius: Depth of crates? Myroslav: 10cm = height of ADC module, additional space for backplate and connector. Rest available for cables.
  • Myroslav: Hydraulic pads for endcap are in principle commercially available. No detailed design was done by Michel.
Revision 2
11 Nov 2014 - Main.FritzHerbertHeinsius
Line: 1 to 1
 
META TOPICPARENT name="ForwardEndcapMeetings"

Minutes of the forward endcap EMC meeting, 10th of Novemberr 2014, SeeVogh, 14:00-15:00

Changed:
<
<
Topics are not in the order of discussion but by subject.
>
>
Topics are not in the order of discussion, but by subject.
 

Presence
  • Basel: excused
Changed:
<
<
  • Bochum: Claudius, Fritz-Herbert, Mario,, Miriam, Patrick, Stephan, Tobias H., Tobias T., Tom
>
>
  • Bochum: Claudius, Fritz-Herbert, Mario, Miriam, Patrick, Stephan, Tobias H., Tobias T., Tom
 
  • Bonn: Christoph, Ulrike
  • Groningen: Myroslav
  • Uppsala: -
Deleted:
<
<
Xxxxxxxxxxxxxxxxxxxx to be written.........
 
Changed:
<
<
Cables
>
>
Electronics
  • Christoph: new test module with shaper is ready and will be sent to Bochum next Wednesday.
  • Myroslav: Newest ADC received from Pawel last week. Will take a few weeks for software/testing etc.
 
Changed:
<
<
  • Claudius: Cables length for various low voltage (Preamps, THMP, SADC, LP) is not yet determined. Will be sent to Bonn once information is available.
  • Christoph: Status order: Fllotex, quote asked. HV for alveole, sample of more flexible version available.
  • Question: Which connector to use on H&S HV cable? Action: Bochum looks into design of HV patch panel and possible connectors.
  • Bonn will order HV cable for a maximum length of 40km.
  • Action: Need to define in PANDA technical board the location of the crates for forward endcap EMC.
  • Concerning location of power supplies: Action (to system managers): Ask Lars for radiation map.
>
>
Cables
  • Christoph: Quotes available. Order signal cables (16 weeks production time), order HV cable (delivery week 7/2015)
  • Christoph: low voltage: examples to RUB. HV cables for VPTT will be ordered, HV for APD rated 300 V.
  • Fritz-Herbert: Cables for alveole should be ordered, such that VPTT alveole mass production starts latest in January.
 

Mechanics
Changed:
<
<

  • Cable and cooling routing through solenoid: Question: Are the holes U-shaped, such that one can move in the endcap with cable-trays and cooling mounted? Action: Myroslav will ask Rick.
  • Myroslav has reveived a new ADC from Pawel. He will check how to make cooling in the crates thinner. Current plan: 10 digitizer/crate with one common power supply. ADC horizontally inserted. depth 19cm, 9cm for cables and connectors.
  • Bochum: It will be difficult to accommodate 22 crates. More ADCs/crate possible?
  • Matthias: Space between crates is small for cooling connections. May require two different designs of crates.
  • Christoph: Bonn cannot produce interface pieces, they are still waiting for numbers from KVI. Action: Myroslav will ask Rick to provide the hole positions and angles for the full Alveoli.
>
>
  • Myroslav: RUB got all swagelok connectors from KVI. Rick will sent a list with all required types (and order numbers) in the next few days.
  • Christoph, Tom: Inserts, mount plates and alveoli can be transported to Bochum by car (driver from Bonn University) whenever possible.
  • Myroslav on crate design: New ADC has components on both sides. Will work on how to cool in the next few weeks.
  • Claudius: Depth of crates? Myroslav: 10cm = height of ADC module, additional space for backplate and connector. Rest available for cables.
  • Myroslav: Hydraulic pads for endcap are in principle commercially available. No detailed design was done by Michel.

Photodetectors
  • Christoph: More measurements of VPTTs@0.99T, theta=0 and HV=1000V performed. Reduction of gain due to mag. field to about factor 0.4-0.5. 30 VPTTs measured/week. Action: Christoph will sent around results after next measurements (Due date: next Tuesday). After that will do final decision on preamp gain for VPTTs.
  • Ulrike: What is the status of the APDlab measurements? Do we need to irradiate all APDs? Fritz-Herbert: Please ask Andrea about details.
 

AOT
Changed:
<
<
  • Bonn has submitted shaper boards with "final" design. Once ready the boards will be sent to Basel and Bochum.
  • Fritz-Herbert: The support frame for Juelich will be discussed next week with FZ Juelich engineer. Ulrike: Will it be moveable to shoot proton from COSY in crystals? Answer: no, we will use only particles after target. E.g. pi0 for calibration.
  • Christoph: VPTT delivery schedule: Week 45,49,1,6,7 and 11 last delivery.
>
>
  • Rauischholzhausen attendance: Myroslav possibly, Bonn: not possible, Bochum: Tom, Matthias, Claudius, Tobias T., Fritz-Herbert
 

Changed:
<
<
-- FritzHerbertHeinsius - 29 Oct 2014
>
>
-- FritzHerbertHeinsius - 11 Nov 2014
 